Permits

Pool permits, jurisdiction by jurisdiction.

Permitting is the part that stops most pool projects here, and it is the part you never have to touch. We draw it, engineer it, submit it, answer any corrections and carry the permit. This page is simply so you can see what we are handling on your behalf, city by city.

On this page
In short

Every in-ground pool or spa in California needs a building permit, and most also need a planning or zoning clearance first. The package is submitted online in every jurisdiction we work in. First review takes approximately two weeks in the fastest cities and several months in the slowest, and the plan set must show two of seven state drowning-prevention features and meet the 2025 Energy Code.

What every jurisdiction asks for

The details differ, but the bones of a residential pool submittal are the same everywhere on the South Coast: a site plan drawn to scale showing the pool, spa, equipment pad, setbacks and the barrier; structural drawings and calculations for the shell; a plumbing schematic with pipe sizes; a gas schematic sized to the heater load where gas is used; electrical drawings with bonding and the equipment disconnect; the state energy forms; and a barrier plan showing which drowning-prevention features you are relying on.

Where the lot slopes, sits in a coastal zone, or has expansive or uncertified soil, a geotechnical report joins the set. We prepare and submit all of it in-house, and our own plan review checks the package against the correction patterns we see from each jurisdiction before it is ever uploaded.

The two statewide rules that shape every set

Drowning prevention: two of seven

Under the California Swimming Pool Safety Act, a permit for a new or remodeled pool or spa at a single-family home requires at least two of these seven features. The building official inspects them at final and signs off only when they are in place.

  1. An enclosure isolating the pool from the home, meeting Health and Safety Code section 115923.
  2. Removable mesh fencing meeting ASTM F2286, with a self-closing, self-latching gate.
  3. An approved manual or power safety cover meeting ASTM F1346.
  4. Exit alarms on every door and window giving direct access to the pool.
  5. A self-closing, self-latching device on every direct-access door, with the release at least 54 inches above the floor.
  6. A water-entry alarm meeting ASTM F2208.
  7. Any other means of protection verified by an approved testing laboratory to the standards of a national organization such as ASTM or ASME.

A door with both an exit alarm and a self-latching device counts as one feature, not two, and a safety cover paired with a water alarm does not satisfy the rule either. Spas with an approved locking cover are treated differently. Some jurisdictions layer local rules on top: Los Angeles County, for example, requires an enclosure in every case plus additional features.

The 2025 Energy Code

For permit applications filed on or after January 1, 2026, the 2025 California Energy Code applies. For pools and spas that means, among other things, a permanently installed time switch, a cover on any heated outdoor pool or spa, no continuously burning pilot light, plumbing sized to the code's flow rules, and, most significantly, that the primary pool or spa heater be a heat pump and/or solar, or draw at least 60 percent renewable or recovered energy. We design heating around the code that applies to your permit date.

Where each jurisdiction stands

Where a jurisdiction publishes a plan-check target, we quote it. Most do not publish one. Every city and county sets its own pace and every property brings its own conditions.

JurisdictionCoversSubmit viaPublished review target
City of Santa BarbaraSanta Barbara city limitsAccela Citizen AccessCity target: 10 business days per review cycle
County of Santa BarbaraMontecito, Hope Ranch, Summerland, Santa Ynez Valley, unincorporated Goleta and CarpinteriaAccela Citizen Access, 24/7Not published publicly
City of GoletaGoleta city limitsgoleta.onlinegovt.comNot published publicly
City of CarpinteriaCarpinteria city limitsCommunity Development counterNot published publicly
City of VenturaVentura city limitsVenturaOPSNot published publicly
County of VenturaUnincorporated Ojai ValleyCitizen Access portalNot published publicly
City of OjaiOjai city limitsCitizen PortalNot published publicly
City of SolvangSolvang city limitsBuilding DivisionNot published publicly
City of MalibuMalibu city limitsBuilding Permit Request PortalNot published publicly
City of Los Angeles (LADBS)Woodland Hills, Porter RanchePlanLALADBS: “within weeks depending on workload”
City of Thousand OaksThousand Oaks city limitsTO/24 portalNot published publicly
City of Westlake VillageWestlake Village city limitsLA County Building & Safety (EPIC-LA), by contractNot published publicly

How we make this easy for you

You sign one contract and talk to one company. From there the drawings, the structural engineering, the soils report if your lot needs one, the submittal, the corrections and the permit itself are ours to carry. You are never the one on hold with a plan checker or wondering what the city wants next.

Before submittal, every drawing set goes through our own review, a process we developed in-house and refined against the correction patterns we see from each jurisdiction. We check the set the way the plan checker will and resolve what they would have asked for while the drawings are still on our desk. Review windows remain approximate, and they always will, but the part within our control is handled with real care.

Answers

Questions we are asked

Do I need a permit to build a pool in California?

Yes. An in-ground pool or spa is a structure and requires a building permit in every jurisdiction we work in, and most require a planning or zoning clearance first. Prefabricated above-ground pools under about 24 inches deep and 5,000 gallons are typically exempt from the building permit, though a zoning permit may still apply and any utility connection needs its own permit.

Who pulls the permit?

We do. We prepare the drawings, engineering and energy forms, submit through the jurisdiction's portal, answer plan-check corrections, and carry the permit through final inspection. You are never chasing a separate engineer or expediter.

How long does plan check take?

It depends entirely on the jurisdiction and the parcel. The City of Santa Barbara publishes a ten-business-day target per review cycle; the City of Los Angeles says “within weeks depending on workload.” In our recent projects, Ventura and Solvang have run approximately one to one and a half months, Santa Barbara County approximately three months and sometimes six or more, and Malibu a year or more. We give you the realistic window for your address before you sign anything.

Does Montecito require architectural review for a pool?

According to the County's current submittal requirements, swimming pools, hot tubs and spas are exempt from Board of Architectural Review unless they are part of a larger project that requires it. Retaining walls, structures and grading associated with the pool may still trigger review, which is one reason the site plan is drawn carefully.

What is the 'two of seven' rule?

California's Swimming Pool Safety Act requires a new or remodeled residential pool to have at least two of seven approved drowning-prevention features, such as an isolating enclosure, an approved safety cover, door and window exit alarms, or a self-latching door device. The building inspector verifies them at final.

Can I still put a gas heater on a new pool?

For permits filed on or after January 1, 2026, the 2025 Energy Code requires the primary pool or spa heater to be a heat pump and/or solar, or to draw at least 60 percent renewable or recovered energy. We will walk you through what that means for your project and design the system around the code that applies to your permit date.

Start here

Tell us the address. We will tell you the jurisdiction.

A street address does not settle it; the parcel does. Send us the property and we will confirm who reviews it, what they will want to see, and the realistic window.