Los Angeles County

Pool builder in Malibu.

Malibu is its own category. Coastal and geologic review layers mean approximate timelines of a year or more, and we say so at the very first conversation so the plan is built around it. Clients who start early get beautifully resolved designs.

Custom pool and raised spa behind a modern home
Jurisdiction
Malibu
Plan check
a year or more
Permit to water
~3 months
With decking
~4 months
On site

Building in Malibu

Before excavation in Malibu we call in dig alert two weeks ahead and hold a pre-site inspection, booked a week ahead and held at least a week before we dig.

A year or more before anything is dug.

Malibu review, Coastal Commission involvement and geologic requirements combine into the longest approximate window in our service area. We are candid about that from the first conversation, and we use the time to resolve a design properly.

Geology and slope.

Bluff, canyon and hillside parcels carry geotechnical and structural requirements well beyond a standard pool package.

Design time is not the constraint.

With a window that long, the design gets the attention it deserves. The pool that gets built is the one you actually want.

Start here

Thinking about a pool in Malibu?

We will walk the site, confirm the jurisdiction from the parcel, and give you a timeline you can actually plan around.